DESIGN PLUS THE S HOTEL

: Reinforced Concrete
: Haldun Ibrahim Demirhisar
: Haldun Ibrahim Demirhisar
: Ascend Hotel Collectıon
: Project Manager (Haldun Ibrahim Demirhisar)

Size : 1 Basement+5= 6 Floor 7.820 m²

 

127 standart, 4 Suits, 1 Disabled Rooms

1 Restaurant, 4 Meetig Rooms,

Spa, Indoor and outdoor Swiming Pools

: Managed To The Design Office, Project Management Of Design Development, Pre-Preparing Cost Analysis And Cost Plans, Consulted On Design And Construction Process, Monitoring Construction, Managed The Sub-Contracting and Implementation,Enabled The İnternal Communication Between Subcontractor.